fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/assessment-and-future-scenarios-of-knoydarts-electricity-system-2013-.pdf
/0 2/ 20 11 2 1: 28 15 /0 2/ 20 11 0 4: 28 25 /0 2/ 20 11 1 0: 58 07 /0 3/ 20 11 1 5: 58 17 /0 3/ 20 11 2 2: 28 28 /0 3/ 20 11 1 8: 58 10 /0 4/ 20 11 0 8: 58 25 /0 4/ 20 11 0 8: 58 10 /0 5/ 20 11 0 0: 58 [...] using an interest rate of 6.5% and the Internal Rate of Return of the project is 25.06%. 0 5,000 10,000 15,000 20,000 25,000 30,000 35,000 40,000 45,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Monthly [...] 57 60 72 432 0.112 0.094 0.094 53.72 3,868.15 Aug 25,300.75 70 72 504 0.044 0.026 0.026 14.86 1,069.92 70 74.4 520.8 0.074 0.056 0.056 32.01 2,381.25 70 72 504 0.080 0.062 0.062 35.44 2,551.34 Sep 29,834
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/modules/b-brueckenkurs-preparatory-course-in-business-administration.pdf
Umweltmanagement for ‚Developing Countries‘, pre-course, compulsory Lehrform / SWS: Seminar with max. 25 students /3 SWS Arbeitsaufwand: 150 hours Kreditpunkte: 5 ECTS Voraussetzungen: none Lernziele / K [...] entrepreneurship will also be discussed Studien- Prüfungsleistungen: Written examination (approx. 120 min.) Literatur: Hodgetts/Kuratko (1998) Effective Small Business Management. Dryden Press. Robbins/Coulter
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/modules/c-brueckenkurs-preparatory-course-in-economics.pdf
Umweltmanagement for developing countries, pre-course, compulsory Lehrform / SWS: Seminar with max. 25 students /4 SWS Arbeitsaufwand: 150 hours Kreditpunkte: 5 ECTS Voraussetzungen: none Lernziele / K [...] discusses academic and political contents. Studien- Prüfungsleistungen: Written examination (approx. 120 min.) Literatur: • Blanchard (2003) Macroeconomics, Prentice Hall. • Parkin (2008) Economics – seventh
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/modules/modul-32-organisational-behaviour-and-diversity-management-in-international-development-cooperation.pdf
Compulsory Module Lehrform / SWS / form of seminar / teaching hours per week: Seminar / 4 SWS / up to 25 participants Arbeitsaufwand / student workload: Contact hours: 60h Self study: 90h Kreditpunkte / credit [...] achieved the aims of this module is tested through • a visualised and interactive presentation (40 - 6 0 min.) and facilitation of a topic-related exercise based on individual or group work and a final discussion
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/community-development-projects-for-the-supply-of-heat-and-electricity-from-renewables-in-the-isles-of-barra-and-vatersay-2009-.pdf
916 154,717 Annual maintenance costs as a percentage of the total investments 2.5% 2.5% 2.5% Heat tariff (p/kWh) 53 2.5 2.5 2.5 Total annual heat sales and ROCs (£/year) 16,955 6,421 10,909 Simple payback [...] under the following assumptions: 2.5% inflation rate, 8.0% discount rate and 20 years project life A tariff of 4.4 pence per kWh was analyzed. This tariff is about 25% lower than the current heat tariff [...] different supply options, the heating tariff was set at 2.5p/kWh. The most feasible option considering a 20 years project life, 8% discount rate and 2.5% inflation rate was the single 50 kW turbine option
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/ic-2014-applecross-report.pdf
Median: 775 Mode: 600 Min: 232 Max: 10,108 Average: 5253 Median: 3693 Min: 785 Max: 15084 White meter (2 respondents) Average: 786 Median: 786 Min: 400 Max: 1172 Average: 2893 Median: 1510 Min: 400 Max: 6772 [...] 14% 14% 10% 22% 6% 0% 5% 10% 15% 20% 25% 12 mm 25 mm 50 mm 75 mm 100 mm 150 mm 200 mm 250 mm 300 mm Other Depth of insulation 26% 23% 26% 25% 2% 0% 5% 10% 15% 20% 25% 30% Cavity as built Stone without [...] summer 14 14 Number of trips per week in winter 3 3 Time of travel with return journey (min) 40 40 Speed (knots) 25 25 Passengers capacity 12 12 Net tonnage 11 11 Diesel Consumption (liters/hour) 60 - Electricity
fileadmin/content/abteilungen/developing-countries/dokumente/admission/daad-programmbroschu-re-entwicklungsbezogene-studienga-nge-23-24-web.pdf
Developing Countries Auf dem Campus 1 D-24943 Flensburg Germany Phone: +49-(0)461-805-25 03 Fax: +49-(0)461-805-25 05 Email: sesam@uni-flensburg.de Website: www.uni-flensburg.de/eem mailto:sesam%40uni [...] system (e.g. ILO, FAO, UNIDO, UNDP, UNICEF, UNESCO, etc.), the OECD, EU, or regional development banks; 25 Economic Sciences/Business Administration/Political Economics MSc Development Economics DEGREE AWARDED [...] are also part of the program in order to support future career. The limited number of participants (25 to 30 students) in the courses allows for rigorous interaction. The students learn to work in teams
fileadmin/content/abteilungen/developing-countries/dokumente/admission/forms/eem-registration-form-2024-mit-reader-kopie-kopie_01.pdf
School1-Max: School1-Min: school1-NominalGrade: School2: Program2: School2-StartDate: School2-FinishDate: School2-Degree: School2-City: School2-Country: School2-FinalGrade: School2-Max: School2-Min: school2-No [...] Engineering in Energy and Environmental Management in Developing Countries (Intake 2023/Session: 2024-25) (Fill the form on the computer and send it according to the instructions given at the end) Personal [...] programme. German language certificate (if any) Professional work experience after higher education (min. 2 years) Work Experience Details 1: Information: The numeric grade values are to be entered according
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/modules/modul-34-project-management-pme-in-international-development-cooperation.pdf
SWS/ Gruppengröße: This module is conducted as seminar taking 4 semester week hours (4 SWS) for up to 25 participants each. Arbeits-aufwand: Within this module students study an additional 90h on their own [...] relevant literature and internet sites is tested through • a visualised and interactive presentation (30 min) and facilitation of an exercise based on individual or group work preparation, • elaboration on the
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/2017-final-report-international-class.pdf
Fulfilled? (800kW) (900kW) A (500kW) 45.0 25.2 25.4 21 1,102 YES (800kW) (900kW) B (500kW) 45.0 25.2 27.7 23.9 798 YES (800kW) (900kW) C (500kW) 45.0 25.2 25.4 21.7 995 YES 60 kW Craft village turbine [...] Height [m] 50 55 40.5 18.6 38 Rotor diameter [m] 53 44 39 16 21 Estimated operational life[years] 20-25 20-25 15-20 20 20 Annual power generated [MWh] 3803 3472 1930 221 454 Turbine capacity factor [%] 54.3% [...] 2017). Table 1.3 shows a summary of the common assumptions taken for the economic model. RPI 2.5% Inflation rate 2.5% Discount rate 6.0% Debt 100% Interest rate 8% Repayment schedule Annuity Local tax 100%