fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/1.-eem-international-class-2015-achiltibuie-final.pdf
panel heater 13 14,1% heat pump 4 4,3% gas 9 9,8% oil 25 27,2% solid fuel 23 25,0% Not known 10 10,9% TOTAL 92 [24] Electrical heating systems amount to 25, including the heat pumps systems, and 57 houses use [...] heating has to provide must consider that there is a 25% loss in the heat distribution network. As such, the daily values of heat demand were increased by 25% to 579.86 MWh and this is the actual dimensioning [...] Community Hall - - 1 (peak demand 80kW) £9,850 - £2.5 / kW Achiltibuie Primary School - - 1 (peak demand 49 kW) £4,280 £9,000 (Assumed: 2 Semi-Detached) £2.5 / kW Total DHN Investment £253,372 Operation Pumping
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/ic-2014-applecross-report.pdf
Median: 775 Mode: 600 Min: 232 Max: 10,108 Average: 5253 Median: 3693 Min: 785 Max: 15084 White meter (2 respondents) Average: 786 Median: 786 Min: 400 Max: 1172 Average: 2893 Median: 1510 Min: 400 Max: 6772 [...] 14% 14% 10% 22% 6% 0% 5% 10% 15% 20% 25% 12 mm 25 mm 50 mm 75 mm 100 mm 150 mm 200 mm 250 mm 300 mm Other Depth of insulation 26% 23% 26% 25% 2% 0% 5% 10% 15% 20% 25% 30% Cavity as built Stone without [...] summer 14 14 Number of trips per week in winter 3 3 Time of travel with return journey (min) 40 40 Speed (knots) 25 25 Passengers capacity 12 12 Net tonnage 11 11 Diesel Consumption (liters/hour) 60 - Electricity
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/potential-of-renewable-energy-in-the-north-harris-trust-area-2005-.pdf
Investment cost, GBP 105000 105000 105000 Interest rate 6.4% 6.4% 6.4% Life time of boiler, year 25 25 25 Maintenance cost @4% of investment, GBP/year 4200 4200 4200 Total wood fuel need, air dry ton (adt)/year [...] Total investment cost, GBP 85000 85000 85000 Interest rate 6.4% 6.4% 6.4% Life time of boiler, year 25 25 25 Maintenance cost @4% of investment, GBP/year 3400 3400 3400 Total wood fuel need, air dry ton (adt)/year [...] discussion with Mr. Ken Mackay who is working for the Aline forest, date: 25 August 2005 2 Aline forest visit with Mr. Ken Mackay on 25 August 2005 3 Information received by email from Ken Mackay on 5 September
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/options-for-development-of-community-wind-energy-projects-in-the-north-isles-of-shetland-2007-.pdf
Battery Power 800 600 600 800 kW Storage capacity 2,000 900 1,500 2,000 kWh Storage Duration 2.5 1.5 2.5 2.5 hrs Annual Feed Into The Grid Direct from Wind Turbines 15,632 10,373 16,193 15,632 MWh Battery [...] Operation (6h/d) 145 205 150 Days Annual H2 Consumption 197,167 278,753 203,966 Nm³ HICE Efficiency 25 25 25 % Hydrogen For Transport Annual Fossil Fuel Requirement 10,500 10,500 10,500 litres Hydrogen Equivalent [...] Financial Calculation Inflation 2.5 % Discount Rate 8 % Plant Life Time (Years) 25 years Electricity Price(Off Peak) 0.01 £/ kWh Electricity Price (Peak) 0.05 £/ kWh O &M Cost 23 2.5 % Tax Rate 30 % ROC 0.046
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/community-development-projects-for-the-supply-of-heat-and-electricity-from-renewables-in-the-isles-of-barra-and-vatersay-2009-.pdf
916 154,717 Annual maintenance costs as a percentage of the total investments 2.5% 2.5% 2.5% Heat tariff (p/kWh) 53 2.5 2.5 2.5 Total annual heat sales and ROCs (£/year) 16,955 6,421 10,909 Simple payback [...] under the following assumptions: 2.5% inflation rate, 8.0% discount rate and 20 years project life A tariff of 4.4 pence per kWh was analyzed. This tariff is about 25% lower than the current heat tariff [...] different supply options, the heating tariff was set at 2.5p/kWh. The most feasible option considering a 20 years project life, 8% discount rate and 2.5% inflation rate was the single 50 kW turbine option
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/the-transport-sector-in-rousay-and-eday-energy-cost-and-emissions-compared-to-kirkwall-2010-.pdf
539 g 2,5 Kg Eggs 28 Units 30 Units Butter 776 g 0,75 Kg Margarine 329 g 0,25 Kg Vegetable and salad oils 785 g 1 Lts xvii Fresh oranges 836 g 0,8 kg Lemon 1.405 g 1,5 Kg Fresh apples 2.550 g 2,5 Kg Fresh [...] brown or wholemeal 1.899 g 2 Kg Flour 905 g 1 Kg Cakes, buns and pastries 2.642 g 2,5 Kg Biscuits and crispbreads 3.323 g 3,25 Kg Oatmeal and oat products 556 g 0,5 Kg High fibre breakfast cereals 795 g 0 [...] The average transport energy demand of households in Rousay (excluding the ferry transport) is about 25% higher than the one in Eday. However, when the ferry transport is included in the household sector
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/assessment-and-future-scenarios-of-knoydarts-electricity-system-2013-.pdf
/0 2/ 20 11 2 1: 28 15 /0 2/ 20 11 0 4: 28 25 /0 2/ 20 11 1 0: 58 07 /0 3/ 20 11 1 5: 58 17 /0 3/ 20 11 2 2: 28 28 /0 3/ 20 11 1 8: 58 10 /0 4/ 20 11 0 8: 58 25 /0 4/ 20 11 0 8: 58 10 /0 5/ 20 11 0 0: 58 [...] using an interest rate of 6.5% and the Internal Rate of Return of the project is 25.06%. 0 5,000 10,000 15,000 20,000 25,000 30,000 35,000 40,000 45,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Monthly [...] 57 60 72 432 0.112 0.094 0.094 53.72 3,868.15 Aug 25,300.75 70 72 504 0.044 0.026 0.026 14.86 1,069.92 70 74.4 520.8 0.074 0.056 0.056 32.01 2,381.25 70 72 504 0.080 0.062 0.062 35.44 2,551.34 Sep 29,834
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/ic-2016-the-assessment-of-renewable-energy-projects-for-community-benefit-in-west-harris.pdf
Dubhlinn (Km2) 5.032774 Date Time 15 mins Flow (Glean Dubhlinn) Hourly Flow Gleann Dubhlinn 15 mins Flow Site A Hourly flow Site A 15 mins Flow Site B Hourly flow Site B 15 mins Flow Site B Hourly flow Site C [...] ly 25,906 – 32,645 kWh annual heating demand per house- hold in West Harris. The total expenditure which flows out annually for the heating fuels amounts to £ 35,374 for 25 respondents. From the 25 respondents [...] .................................... 25 Figure 7.4.4: Weibull distribution and Energy rose .................................................................... 25 Figure 7.4.5: Turbulence intensity curve
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/2017-final-report-international-class.pdf
Fulfilled? (800kW) (900kW) A (500kW) 45.0 25.2 25.4 21 1,102 YES (800kW) (900kW) B (500kW) 45.0 25.2 27.7 23.9 798 YES (800kW) (900kW) C (500kW) 45.0 25.2 25.4 21.7 995 YES 60 kW Craft village turbine [...] Height [m] 50 55 40.5 18.6 38 Rotor diameter [m] 53 44 39 16 21 Estimated operational life[years] 20-25 20-25 15-20 20 20 Annual power generated [MWh] 3803 3472 1930 221 454 Turbine capacity factor [%] 54.3% [...] 2017). Table 1.3 shows a summary of the common assumptions taken for the economic model. RPI 2.5% Inflation rate 2.5% Discount rate 6.0% Debt 100% Interest rate 8% Repayment schedule Annuity Local tax 100%
fileadmin/content/portale/die_universitaet/dokumente/satzungen/amtliche-satzungen/2008/satzung-sport-ep-20080213.pdf
ungen - männlich weiblich Laufen 3000 m Bahnlauf 13:00 Min. 2000 m Bahnlauf 10:30 Min. 2. Kraftausdauer 2.1 Schwimmen (200 m) 4:10 Min. 4:30 Min. 2.2 Klimmzughang 35 Sek. 20 Sek. 3. Schnellkraft 3.1 Jump [...] Die Minimalanforderungen lauten: Frauen: 2000 m in 10:30 Min. Männer: 3000 m in 13:00 Min. - 9 - KRAFTAUSDAUER (Schwimmen) Testaufgabe Auf einer 25-m-Bahn die 200-m-Strecke innerhalb einer vorgegebenen Zeit [...] ermittelt. Testaufbau Die Bahnlänge beträgt 25 Meter. Testmaterialien • Stoppuhren • Startsignal Wertung Die Minimalanforderungen lauten: Frauen: 4:30 Min. Männer: 4:10 Min. - 10 - KRAFTAUSDAUER (Klimmzughang)