fileadmin/content/abteilungen/gesundheit/abschlussarbeiten/kohorte-7/abstract-hannah-catharina-gaede.pdf
neither a statistical nor a clinical significant effect could be identified. Furthermore, the case-to-case study has achieved a positive development of the responder during the intervention whereas the [...] interviews’ findings which confirmed a high acceptance among the participants. Additionally, the case-to-case study confirmed the intervention’s primary preventive success as the non-stressed responder was [...] preventive character proved to be true especially for non-stressed leaders as it was shown in the case-to-case study as well as in the interviews at post-measurement. Henceforth, participants seemed to aim
/kurs/kolloquium-und-publikationen/kolloquium
OSL 247 06.11.: Jeff Williams (Texas Tech University) Expressivity in an endangered language: the case of echo words in Scots ; 17-19 Uhr s.t., EUF, OSL 247 13.11.: Josep Cru (Newcastle) Indigenous language [...] Dalska) & Henrik Rosenkvist (Göteborgsuniversitet) Sociolinguistics of an unrecognised minority: The case of Älvdal in Sweden ; 18-20 Uhr s.t., EUF, OSL 044 15.05.: Workshop ‚Language, discrimination and
/powi/wer-wir-sind/professor-2/prof-dr-christof-roos
University of Paris, No. 82 Magoni, Raphaele, Roos, Christof, Buda, Dirk. 2007. Migration from Africa: A Case Study on Root Causes and Factors Contributing to Migration from Senegal to the EU, European Commission:
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/2017-final-report-international-class.pdf
among the four cases in the winter periods. In the summer, the energy output from the four cases do not vary significantly. Figure 45 shows the monthly energy produced by the different cases considered. During [...] demand. In the second case, the 12-hour demand was calculated based on the 95% peak. In the third case, the 12-hour demand was calculated taking the maximum demand. In all three cases, the storage of the [...] connection to the grid to supply heating demand in-case the micro- brewery plant is halted. Therefore, an asynchronous (induction) generator is recommended in case of connection to the grid since it allows for
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/ic-2016-the-assessment-of-renewable-energy-projects-for-community-benefit-in-west-harris.pdf
referred to as Case 1 and Case 2 respec- tively. The scenarios are then compared in the economic analysis to compare which option is better economically. Figure 11.3.2 shows the scenario for case 1 whereby [...] Gleann Dubhlinn Hydrogen Production Schematic Diagram (Case 1) ............... 89 Figure 11.3.5: Gleann Dubhlinn Hydrogen Production Schematic Diagram (Case 2) ............... 89 Figure 11.3.6: Laxdale Hydrogen [...] .. 53 Table 9.6.1 Economic Results for example case: Luskentyre 94m head, 60kW ....................... 56 Table 9.6.2: Economic Results for example case: 54m head 35kW ................................
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/assessment-and-future-scenarios-of-knoydarts-electricity-system-2013-.pdf
To find out the demand of each category the electricity bills from the year 2012 were used. In the case of the residential sector, it was possible to subdivide into different energy end uses (lighting, [...] system stops recording. • During planned shutdown the system is turned off. • Unplanned shutdown, in cases of breakdown. It is important to clarify the meaning of the words shutdown and breakdown. Basically [...] interface (Overall efficiency, power output, rainfall, dam water level, flow). Reporting to team leader in case of deviations from regular range Daily as part of daily routine 5 minutes (Hydro manager) Collecting
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/assessment-of-renewable-energy-technologies-for-the-sustainable-development-of-the-isle-of-jura-2012-.pdf
legislation, SEPA will consider each application for discharge of industrial waste water on a case by case basis and set conditions according to the nature of the effluent and the nature of the water [...] projects in Scotland. These values and figures were provided by Community Energy Scotland and in some cases directly from the turbine manufactures. 3.4 Analysis of wind energy potential 3.4.1 Wind resource [...] the project and identifies a set of principles to which the proposed project must adhere to. In the case of Jura, the design framework and principles were completed in February, 2012 and the findings are
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/an-evaluation-of-the-clean-sleat-project-2011-.pdf
their motivation was mainly the cost of other fuels (in three cases). The fact that the wood was easily available or for free (three cases); or the combination of both was the motivation for the others [...] tonnes/annum) and the reuse quantity was 1 tonne/annum. The accounted recyclable materials in this case include the recycling materials dumped into blue bin and materials which were dropped at the recycling [...] recycling points are only sustainable if more people begin to use them. Therefore sustainability in this case is directly linked with local recycling awareness programmes. In the food sector the activities of
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/the-transport-sector-in-rousay-and-eday-energy-cost-and-emissions-compared-to-kirkwall-2010-.pdf
different per case and location, for example for the case ‘Car-Car on the Ferry-Car’ in Rousay the difference between the normal price and the 50 trips price is 40 %, while in Eday for the same case the difference [...] In the case of Eday this options was not considered because the island is far away (about 16 miles) from mainland Kirkwall. v Reducing the number of trips between the islands and mainland In case of Rousay [...] energy consumption per trip for the analyzed cases in Rousay .........- 53 - Table 5. 3 CO2 emissions and transport energy consumption per trip for the analyzed cases in Eday .............- 53 - Table 5. 4 Public
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/community-development-projects-for-the-supply-of-heat-and-electricity-from-renewables-in-the-isles-of-barra-and-vatersay-2009-.pdf
facilities in Castlebay and Vatersay areas. In the former case the possibility of using wind energy to supply electricity was analysed and in the later case, the possibility of supplying heat from wind and biomass [...] is not viable either with or without a subsidy but the wind-oil supply option is viable in iv both cases with an annual profit of 171,943. With the subsidy the payback period is 4.7 years while without the [...] Author The temperature in the thermal storage tank needs to be maintained between 70 o C and 90 o C. In case the load increases during a certain period, the temperature in the lowest part of the tank will reduce