fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/2017-final-report-international-class.pdf
among the four cases in the winter periods. In the summer, the energy output from the four cases do not vary significantly. Figure 45 shows the monthly energy produced by the different cases considered. During [...] demand. In the second case, the 12-hour demand was calculated based on the 95% peak. In the third case, the 12-hour demand was calculated taking the maximum demand. In all three cases, the storage of the [...] connection to the grid to supply heating demand in-case the micro- brewery plant is halted. Therefore, an asynchronous (induction) generator is recommended in case of connection to the grid since it allows for
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/ic-2016-the-assessment-of-renewable-energy-projects-for-community-benefit-in-west-harris.pdf
referred to as Case 1 and Case 2 respec- tively. The scenarios are then compared in the economic analysis to compare which option is better economically. Figure 11.3.2 shows the scenario for case 1 whereby [...] Gleann Dubhlinn Hydrogen Production Schematic Diagram (Case 1) ............... 89 Figure 11.3.5: Gleann Dubhlinn Hydrogen Production Schematic Diagram (Case 2) ............... 89 Figure 11.3.6: Laxdale Hydrogen [...] .. 53 Table 9.6.1 Economic Results for example case: Luskentyre 94m head, 60kW ....................... 56 Table 9.6.2: Economic Results for example case: 54m head 35kW ................................
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/potential-of-renewable-energy-in-the-north-harris-trust-area-2005-.pdf
households show interest to change their actual hot water system, so they were selected as study cases. Due to the weather in North Harris, evacuated tube collectors are the appropriate technology for [...] Trust intends to completely renovate the residential and workshop building and convert it into a ‘show-case’ of use of renewable energies. To get the best alternative, we analyzed five possible options namely [...] the heating demand of the swimming pool and a solar PV system to generate electricity. Other show cases are the community-based Gearrannan project, which uses a ground source heat pump to meet 100% of heating
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/the-ecological-footprint-of-the-sleat-peninsula-2008-.pdf
(gha/capita) ………. 43 Figure 7.1 Comparison of CO2 Emissions From Direct Energy Consumption In Base Case And Alternative Scenarios (Transport Not Included) ………………………….……….. 45 Ecological Footprint of Sleat [...] whether the study should calculate footprints within the geographical or administrative border. In this case this means all activities that occur within the geographical boundaries of that community or country [...] nation is already calculated, accounting for the energy used to supply and treat water would in this case result into double counting. Similarly, if food consumption of a local restaurant has already been
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/towards-sustainable-energy-a-roadmap-for-residential-buildings-at-loop-head-ic-2022.pdf
electricity consumption of Case Study II in 2021 is 17,038 kWh. The Case Study II has high electricity consuming loads such as an electric car and a heat pump. Similar to case study I, case study II pays a fixed [...] payback period of this case would be 38 years with an uncertainty range between 34 to 49 years. Case study I 81 Figure 5.5: Total investment cost and Discounted Payback Period of case study 1 Source: Author [...] during lowest irradiation- case study I Source: Author based on Homer Pro simulation Case study I 98 Figure 5.14: Time-series plot of PV system during highest irradiation- case study I Source: Author based
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/the-transport-sector-in-rousay-and-eday-energy-cost-and-emissions-compared-to-kirkwall-2010-.pdf
different per case and location, for example for the case ‘Car-Car on the Ferry-Car’ in Rousay the difference between the normal price and the 50 trips price is 40 %, while in Eday for the same case the difference [...] In the case of Eday this options was not considered because the island is far away (about 16 miles) from mainland Kirkwall. v Reducing the number of trips between the islands and mainland In case of Rousay [...] energy consumption per trip for the analyzed cases in Rousay .........- 53 - Table 5. 3 CO2 emissions and transport energy consumption per trip for the analyzed cases in Eday .............- 53 - Table 5. 4 Public
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/options-for-development-of-community-wind-energy-projects-in-the-north-isles-of-shetland-2007-.pdf
with the wind data obtained from 1st February, 2005 to 30th November, 2006 from the NYDC.20 Case 1: In this case three scenarios may be considered where the consistency of electricity supply to the grid [...] produced by utilization of excess electrical energy can be used as a secondary storage option. Case 2: In this case the total generation from the wind turbines can be fed into the grid in combination with a [...] wind. Without the use of storage 93% would be covered from wind. The annual capacity factor in this case is 43%. 4.5. TECHNICAL ASPECTS 4.5.1. Wind Turbine Capacity This option has selected 3 x 850 kW Vestas
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/exploring-sustainable-energy-options-for-loop-head-ic-2021.pdf
pump air-to water and heat pump air-to air are available from SEAI (SEAI, 2020b). 4.1.5.4 Case study results This case study can help in bringing understanding of energy efficiency measures in buildings, their [...] n. To analyse those cases in detail, we asked in the interviews if the electricity consumption includes house consumption or whether it is exclusively for the farm. In those cases where the values include [...] because the LCOE is higher than the feed-in tariff. In any case, the use of the tool could lead to a better understanding of every particular case. In the farming sector, it makes no sense to present an average
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/assessment-of-renewable-energy-technologies-for-the-sustainable-development-of-the-isle-of-jura-2012-.pdf
legislation, SEPA will consider each application for discharge of industrial waste water on a case by case basis and set conditions according to the nature of the effluent and the nature of the water [...] projects in Scotland. These values and figures were provided by Community Energy Scotland and in some cases directly from the turbine manufactures. 3.4 Analysis of wind energy potential 3.4.1 Wind resource [...] the project and identifies a set of principles to which the proposed project must adhere to. In the case of Jura, the design framework and principles were completed in February, 2012 and the findings are
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/sesam-african-workshop-2008-final.pdf
enterprises in a systematic sampling. In each sampling, the first case was randomly selected by drawing slips of paper with numbers from the first cases based on calculated sampling fraction (actual sample size [...] and Development Wilson K. Mbony: The Role of Renewable Energy in the Energy Security of Cameroon: A Case Study of Yaoundé................................................................................. [...] Mensah Hervie: Application of Biogas in Educational Institutions for the Production of Cooking Gas – Case Study at Valley View University..................................................................