fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/1.-eem-international-class-2015-achiltibuie-final.pdf
........................................................... 32 [ii] 7.6 Energy Yield Estimation Process .............................................................................. 32 7.7 Summary - Annual [...] the local community from the development of the projects. The study was conducted by a team of engineering students from Europa Universität Flensburg Germany in a manner that addressed the many facets of [...] well as advice on technical and financial aspects of the projects. The International Class of engineering students from the Europa Universität Flensburg, Germany, is working in cooperation with the CCDC
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/ic-2014-applecross-report.pdf
.......... 71 Figure 5-5: Decision Making Process on Hard-to-Treat House 1 ............................................ 73 Figure 5-6: Decision Making Process on Hard-to-Treat House 2 ................ [...] OF THE REPORT From the 17thof February till the 22nd of March 2014 a group of twelve master of engineering students and three professors from theEnergy and Environmental Management department of the University [...] renewables such as solar PV, solar thermal and micro wind turbines. Then, in order to facilitate the process of decision making and to evaluate the feasibility of proposed alternatives for each Hard to Treat
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/potential-of-renewable-energy-in-the-north-harris-trust-area-2005-.pdf
hydropower plants and wave generators. Scottish and Southern Energy (SSE) has started the planning process to upgrade its transmission system and the cable connection to the mainland, but the expected completion [...] reception) and driver distraction. In general environmental issues play a major role in the planning process of renewable energy systems, namely their impacts on fishery, protected animals, natural scenery [...] unsuitable 300 ha and replacing of the existing conifer with hard wood. Since the total restructuring process of the Aline forest takes place over ten years, every year some wood fuel can be obtained. Further
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/community-development-projects-for-the-supply-of-heat-and-electricity-from-renewables-in-the-isles-of-barra-and-vatersay-2009-.pdf
area. The factory started back in 1974 mainly to process fish meal. In 1990‟s, the management of the factory changed hands and the same was expanded to process more fish and transport it to the mainland. The [...] need to set the tariff of heat energy at 11 p/kWh which would yield an IRR of 11% and 46 Ash well Engineering, Leicester, UK 47 http://www.nahwaerme-forum.de, date: 08.03.2009 48 http://www.drain-system.co [...] when the production is low, one cold store is always shut down due to lack of enough capacity to process. The cold store(s) run for 24 hours. The factory also owns a range of equipments such as Blast freezer
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/the-transport-sector-in-rousay-and-eday-energy-cost-and-emissions-compared-to-kirkwall-2010-.pdf
and March 2010 eleven students of the 18 months Energy and Environmental Management Master of Engineering course of the University of Flensburg/Germany, conducted a study in the Islands of Rousay, Eday [...] poverty indicator in Eday and Rousay. 5 Hernandez and Col, 2006 - 6 - 2.2 Defining the boundary Any process involving the research of reality must be placed within a perspective in time and space6, in that
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/an-evaluation-of-the-clean-sleat-project-2011-.pdf
with Community Energy Scotland as part of the Student’s research assignment at their Master of Engineering course. The Sleat Peninsula is located at the southern tip of the Isle of the Skye. The population [...] were 19 households that never tried composting and 7 others who claimed composting was a difficult process. This neglect and hesitation could be addressed through an awareness programme and training workshops
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/assessment-of-renewable-energy-technologies-for-the-sustainable-development-of-the-isle-of-jura-2012-.pdf
Outputs from AD Processes. This regulation mainly focuses on the use and handling of digestate outputs from the AD processes. (SEPA, Classification of Outputs from Anaerobic Digestion Processes 2012) 5.6.4 [...] for G83/1- 1. This document also allows for a simplified connection process for generating units with capacities up to 50kW. The process is more rigorous for plants above 50kW. Consent is required from the [...] Capacity ASSESSMENT OF HYDRO POWER RESOURCES AND TECHNOLOGIES AT CORRAN RIVER 33 Cost for engineering design and engineering supervision is assumed to be 7.5% and 8% of construction cost respectively. In addition
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/assessment-and-future-scenarios-of-knoydarts-electricity-system-2013-.pdf
Engine Model 6068HF475. John Deere. John Duncanson Engineering Ltd. (n.d.). Knoydart Hydro:Pipeline performance. Ross-shire: John Duncanson Engineering Ltd. Knoydart Foundation. (2011). Knoydart visitor [...] house and a computer in Knoydart Renewables’ office. This radio link communication system is in the process of being changed to a wireless local network communication system. From the observations and assessment [...] further indicated that when the pipe flow was 96 l/sec, the head losses were 60 m (John Duncanson Engineering Ltd.). From the pressure test results, an equivalent roughness coefficient was calculated. This
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/ic-2016-the-assessment-of-renewable-energy-projects-for-community-benefit-in-west-harris.pdf
capacity. A five-week field research was carried out by 14 students undertaking the Master of Engineering in Energy and Environmental Management programme at the University of Flensburg in Germany in close [...] excess electricity (Gleann Dubhlinn) and the generation from Laxdale Wind Site using electrolysis process is seen as a possible option to be proposed in this section. The idea of producing Hydro- gen from [...] overall scheme to better understand their interactions. The diagram illustrates how in a cyclical process driven by innova- tion, a community can look beyond the wind and hydro schemes to reach sustainability
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/2017-final-report-international-class.pdf
- 2x3kW elements Brewing Process 240 31.3 0.8 1 1 6000 - - one double 3 pin socket (FV room) Brewing Process 240 13.0 0.8 1 0.2 499.20 - - Refrigeration units Brewing Process 240 13.0 0.8 1 1 2496 - - [...] controllers for FV Brewing Process 240 13.0 0.8 1 1 2496 - - 1x15kW no stat for copper switch Brewing Process 415 26.1 0.8 3 1 15000 - - 1x12kW no stat for copper switch Brewing Process 415 20.9 0.8 3 1 12000 [...] MWh (David Shearer, 2008, p. 3). 4.3.3 Electricity consumption in the brewing process All installations in the brewing process utilize electricity as their power source (PBC Brewery Installations Ltd., 2008)