fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/the-ecological-footprint-of-the-sleat-peninsula-2008-.pdf
the biocapacity and Ecological Footprint of a country or region. The opposite of an ecological deficit is ecological reserve. A country or region is said to have an ecological reserve when its biocapacity [...] welcome, assistance in our field research and the opportunity given to explore the culture of this region. Without them this study would not have been completed. Our sincere heartfelt gratitude is extended [...] and the natural environment. The ecological footprint accounts the use of natural resources by a region's population. It considers the amount of productive land and water ecosystems in hectares with an
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/present-situation-sustainable-energy-scenario-of-lochboisdale-up-to-2014-2009-.pdf
ion/doc/neeap/uk_en.pdf). accessed 13th March 2009. • Department of Energy and Climate Change, “Regional and local authority electricity consumption statistics: 2005, 2006, 2007”, 2008 • Energy Saving
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/community-development-projects-for-the-supply-of-heat-and-electricity-from-renewables-in-the-isles-of-barra-and-vatersay-2009-.pdf
Indexes according to the sources. Table 2. Comparison of heating indexes of survey and other sources Region Heating Index kWh/m2 Source Horve, Castlebay 113.3 kWh/m 2 Survey SESAM 2009 Barra and Vatersay 199 [...] basis of the other figures provided for organic waste and residue waste which were desegregated by region of origin. 26 Table 9.Energy Potential from waste combustion (January to December 2008) Energy from [...] Renewable Heat Group, 2008, p.35 40 Table 17: Comparison of heating indexes of survey and other sources Region Heating Index kWh/m 2 Source Vatersay 193 kWh/m 2 Survey SESAM 2009 Barra and Vatersay 199 kWh/m
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/the-transport-sector-in-rousay-and-eday-energy-cost-and-emissions-compared-to-kirkwall-2010-.pdf
has an extensive bus network covering all parts of the city, its suburbs and the surrounding city-region. This means that a citizen of Edinburgh has a complete access to mobility using the bus system. The [...] Predicting Fuel Poverty at Small Area Level, University of Bristol http://www.bris.ac.uk/poverty/regional%20poverty.html#fuel • Intergovernmental Panel on Climate Change (IPCC), 4th assessment report, B
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/an-evaluation-of-the-clean-sleat-project-2011-.pdf
activities Direct Energy and water (Excluding transport) Energy and water consumption within Sleat region in all sectors. Energy and water consumption of tourists staying in hotels, B&B and self-catering [...] Sleat Air travel was excluded Materials and waste Long lifetime material consumption within Sleat region in all sectors. Short lifetime material considered under waste. The material required for infrastructure [...] mobile phones and batteries were included as short lifetime materials. Waste generation within Sleat region in all sectors. Waste treatment outside Sleat boundaries Bulk waste (considered as material). Co
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/assessment-of-renewable-energy-technologies-for-the-sustainable-development-of-the-isle-of-jura-2012-.pdf
flaws and provide replacement parts and labor. A turbine supplier from within the Argyll and Bute region is therefore preferred. Another advantage of this choice is that transportation costs will be si
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/assessment-and-future-scenarios-of-knoydarts-electricity-system-2013-.pdf
Knoydart peninsula has 8 main regions, Inverie Village, Draich, Sandaig, Doune, Joiners Croft, Airor, Samadland and Inverguseran. The electricity supply in each of the regions is different. In Inverie Village [...] analysis and others. 2 ENERGY DEMAND Energy models assess the whole energy situation of a country, region or community. Due to the large number of variables which have to be evaluated, it is useful to use [...] from hydropower plant and diesel generator which acts as a backup during shutdowns. The rest of the regions use pico hydropower plants or fossil fuel generators. 25 This chapter focuses on the operation of
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/ic-2016-the-assessment-of-renewable-energy-projects-for-community-benefit-in-west-harris.pdf
WHT for the Gleann Dubhlinn wind project. The purple regions represent the regions with the highest wind speeds. The turbine was placed in this region and the energy output calculated was 35% higher than [...] eagles prefer to fly and nest in windy and mountainous regions. As seen on the Figure 5.2.1 the Gleann Dubhlinn site is nearer to the coast region, in relatively low altitude and at a considerable distance [...] graphical area. It is essential for wind energy planning and it is useful to map a smaller space within a region in order to optimize the positioning of a wind turbine. The parameters required to compute this include
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/2017-final-report-international-class.pdf
installation and access roads construction costs (Renewables First, 2015). It varies from 52 region to region depending on local costs of services (for example, construction works, electrical and installation [...] 3 Wind Resource Assessment In this section, the potential wind resources throughout the specified region have been examined to define the optimum locations for wind turbines. Basically, the preliminary [...] height. This means that the most commonly occurring wind speed is quite high in Durness and this region can be considered as one of the best location for wind energy generation. Figure 25: Weibull Distribution
/en/cpe/teaching/courses
ilung, etc.). Unterrichtssprache: Deutsch Prüfung: Präsentation, Hausarbeit PO 2021: BIM W2 71 "Regional Economics I (Südeuropa)" PO 2024: BIM W2 01 "Politische Ökonomie I - Kultur und Raum" European Economy