fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/an-evaluation-of-the-clean-sleat-project-2011-.pdf
ferry Source: Analysis by the author from household questionnaires Both, the ferry staff at Armadale terminal and the management of the bus company (Stagecoach in Skye and Lochaber) stated in personal interviews [...] be promoted for its initial purpose (being the linkage for people in remote villages to the ferry terminal and the main road so that they can use the bus) it would be more relevant, probably have a higher
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/the-transport-sector-in-rousay-and-eday-energy-cost-and-emissions-compared-to-kirkwall-2010-.pdf
part 3.1.1.4 and 3.1.1.5 Specific assumptions for Rousay: • Average distance from house to ferry terminal : 3.6 miles • Distance from Tingwall to Kirkwall : 15 miles • Full price of ferry ticket for passenger [...] centre. For Eday, the basic assumptions were as follows: • Average distance from house to ferry terminal: 4.1 miles • Distance driven within Kirkwall is 2 miles • Full price of ferry ticket for passenger [...] The weight of an unloaded 7.5 meter long lorry is 7 tonnes21 • The distance between Tingwall ferry terminal and Kirkwall is 13.5 miles.22 • The energy consumption per kg transported by the ferry between Tingwall
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/1.-eem-international-class-2015-achiltibuie-final.pdf
proposed site for the wind turbine is 5km away from the primary substation where the 33kV feeder terminates. To go ahead with this offer, CCDC through Coigach Wind Power Ltd. must therefore construct a 5km
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/assessment-of-renewable-energy-technologies-for-the-sustainable-development-of-the-isle-of-jura-2012-.pdf
Road construction and upgrade cost were obtained from the Forestry Commission, Scotland (2005). Terminal equipment cost (Aquatera Ltd 2005) Wind turbine generator Transformer 480V/33kV 3 phase disconector [...] 202km = 15,990£ 79,159£/km x 0.202km = 15,990£ 79,159£/km x 0.805km = 63,723£ Investment cost of terminal equipment (switchgears, transformers, etc.) and labour Construction and craneage 60,000 £ 60,000
fileadmin/content/zentren/ices/bilder/poster/ukraine-lecture-series-poster-all-dates.pdf
Schwartz-Initiative Further information and the webex-link can be found here: uni-flensburg/ices/termine
fileadmin/content/zentren/ices/bilder/veranstaltungen/lesekreis/pistor-2019-code-of-capital.pdf
opposition from the developing world. The fate of international agreements and norms is not always de- termined by states and their representatives. Closer inspection of how global rules emerge suggests that [...] bad times and ISDA’s MA is highly attentive to questions of a code for the gLoBe 147 default and termination, which loom large in finance. The counter- parties to derivatives are in the business of minting
fileadmin/content/portal/forschung/dokumente/promotion/promordnung-2017-7-.pdf
dieser die Gründe an, so ist in angemessener Frist, spätestens jedoch im folgenden Semester, ein neuer Termin für die Disputation anzusetzen. Erkennt der Promotionsausschuss die Gründe nicht an, gilt die Disputation
fileadmin/content/portal/forschung/dokumente/promotion/promordnung-2017-eng.pdf
Research (“Wissenschaftszeitvertragsgesetz”), the doctoral procedure concludes with the successful termination of the disputation. Ex-matriculation as a doctoral student takes place at the end of the semester [...] aforementioned declaration precludes my admission to the doctoral degree procedure and justifies the termination of the doctoral degree proceedings or revocation of the doctoral title at a later date. ……………………………
fileadmin/content/portal/forschung/dokumente/nachwuchs/3-ices-tdf-2018-10-24_01.pdf
über Aktuelle Ausschreibungen Neuigkeiten am ICES (z.B. neue Projekte) ICES Veranstaltungen und Termine Präsentationthema Referent bzw. Autor 30. Oktober 2018 | Seite 14 Referentin: Dr. Maria Schwab Folie
fileadmin/content/abteilungen/industrial/dokumente/downloads/veroeffentlichungen/diskussionsbeitraege/znes-discussionpapers-007-benefit-of-climate-protection.pdf
and losses in the different sectors of the German economy for two exit scenarios pertaining to a termination of the use of nuclear energy until 2010 (Scenario A and B) and a further trend scenario for an