fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/integrating-renewable-energy-technology-for-heat-demand-and-a-hydrogen-economy-for-unst-ic-2019.pdf
8.1 Input parameters base case scenario 900 kW ....................................................... 31 Table 5.8.2 Heat pump capacity analysis for 900 kW turbine – Base case demand ............... 31 [...] storage analysis for 900 kW turbine- Base case demand ....................... 32 Table 5.8.4 Hydrogen electrolyser capacity analysis for 900 kW turbine- Base case demand33 Table 5.8.5 Hydrogen production [...] peroxide production require the confirmation of two inputs. In the case of ammonia, it requires energy and hydrogen while in the case of hydrogen peroxide it requires energy and oxygen. 16 Electricity
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/a-leap-towards-energy-sustainability-for-loope-head-communities-2020.pdf
................. 61 8.2.1 Case study for a hotel in Loop Head ............................................................................................ 62 8.2.2 B&B Case Study .................... [...] Figure 7-1 (SEAI, 2020). A case study for community owned energy efficiency project is presented in chapter 8, where some of the main criteria shown below will be reflected in the case study regarding community [...] wood pellets biomass boilers could be a suitable solution in this case, because of the comparable less investments. On the other hand, in case of installation of wood pellets biomass boiler a space for wood
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/the-transport-sector-in-rousay-and-eday-energy-cost-and-emissions-compared-to-kirkwall-2010-.pdf
different per case and location, for example for the case ‘Car-Car on the Ferry-Car’ in Rousay the difference between the normal price and the 50 trips price is 40 %, while in Eday for the same case the difference [...] In the case of Eday this options was not considered because the island is far away (about 16 miles) from mainland Kirkwall. v Reducing the number of trips between the islands and mainland In case of Rousay [...] energy consumption per trip for the analyzed cases in Rousay .........- 53 - Table 5. 3 CO2 emissions and transport energy consumption per trip for the analyzed cases in Eday .............- 53 - Table 5. 4 Public
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/assessment-of-renewable-energy-technologies-for-the-sustainable-development-of-the-isle-of-jura-2012-.pdf
legislation, SEPA will consider each application for discharge of industrial waste water on a case by case basis and set conditions according to the nature of the effluent and the nature of the water [...] projects in Scotland. These values and figures were provided by Community Energy Scotland and in some cases directly from the turbine manufactures. 3.4 Analysis of wind energy potential 3.4.1 Wind resource [...] the project and identifies a set of principles to which the proposed project must adhere to. In the case of Jura, the design framework and principles were completed in February, 2012 and the findings are
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/ic-2014-applecross-report.pdf
future cases of consumption increasing and decreasing by 20% with the result shown in Table 4-6Table 4-6 below. TABLE 4-6 FINANCIAL ANALYSIS OF DHS Description Sensitivity Analysis Case 1 Case 2 Demand [...] decrease (case 2), while maintaining the same system capacity for example in case the houses take energy efficient measures our District Heating system is still financially attractive. In case study 3 with [...] resources which in conjunction with Chapter 2 and Chapter 4 convey in Chapter 5 in two case studies. In the first case study, three representatives HtT houses in Applecross and their assessment regarding
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/towards-sustainable-energy-a-roadmap-for-residential-buildings-at-loop-head-ic-2022.pdf
electricity consumption of Case Study II in 2021 is 17,038 kWh. The Case Study II has high electricity consuming loads such as an electric car and a heat pump. Similar to case study I, case study II pays a fixed [...] payback period of this case would be 38 years with an uncertainty range between 34 to 49 years. Case study I 81 Figure 5.5: Total investment cost and Discounted Payback Period of case study 1 Source: Author [...] during lowest irradiation- case study I Source: Author based on Homer Pro simulation Case study I 98 Figure 5.14: Time-series plot of PV system during highest irradiation- case study I Source: Author based
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/exploring-sustainable-energy-options-for-loop-head-ic-2021.pdf
pump air-to water and heat pump air-to air are available from SEAI (SEAI, 2020b). 4.1.5.4 Case study results This case study can help in bringing understanding of energy efficiency measures in buildings, their [...] n. To analyse those cases in detail, we asked in the interviews if the electricity consumption includes house consumption or whether it is exclusively for the farm. In those cases where the values include [...] because the LCOE is higher than the feed-in tariff. In any case, the use of the tool could lead to a better understanding of every particular case. In the farming sector, it makes no sense to present an average
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/potential-of-renewable-energy-in-the-north-harris-trust-area-2005-.pdf
households show interest to change their actual hot water system, so they were selected as study cases. Due to the weather in North Harris, evacuated tube collectors are the appropriate technology for [...] Trust intends to completely renovate the residential and workshop building and convert it into a ‘show-case’ of use of renewable energies. To get the best alternative, we analyzed five possible options namely [...] the heating demand of the swimming pool and a solar PV system to generate electricity. Other show cases are the community-based Gearrannan project, which uses a ground source heat pump to meet 100% of heating
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/present-situation-sustainable-energy-scenario-of-lochboisdale-up-to-2014-2009-.pdf
most commonly used strategies to define the boundary: Geographical (administrative) boundary: In this case, the researcher counts all emissions which occurred within the geographical boundary of project.10 [...] by the activities of local residents.11 Each strategy has its own pros and cons. For instance, in case of tourists, if the researcher uses the responsibility boundary, it would be very hard to track all [...] it covers only fuel and operational costs. Investment and maintenance costs are not covered in this case. Demand cost which consists of heating, appliances and transport costs show a similar pattern with
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/sesam-african-workshop-2008-final.pdf
enterprises in a systematic sampling. In each sampling, the first case was randomly selected by drawing slips of paper with numbers from the first cases based on calculated sampling fraction (actual sample size [...] and Development Wilson K. Mbony: The Role of Renewable Energy in the Energy Security of Cameroon: A Case Study of Yaoundé................................................................................. [...] Mensah Hervie: Application of Biogas in Educational Institutions for the Production of Cooking Gas – Case Study at Valley View University..................................................................