fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/community-development-projects-for-the-supply-of-heat-and-electricity-from-renewables-in-the-isles-of-barra-and-vatersay-2009-.pdf
of the study team members. 1.4. Literature Review The literature review involved review of reports of studies, maps, standards and other relevant literature. The study reports used in this study include [...] and skills acquired in their own countries. 2 Map of the study area. Source: Google Earth, 2009 1.2. Study Objectives The main objective of the study was to identify business opportunities for the Barra and [...] pence (British) t tonne yr year xvi 1. Introduction 1.1. Purpose and Background of the Study The purpose of this study was to assess the technical and economic potential of supplying electricity to the B
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/the-transport-sector-in-rousay-and-eday-energy-cost-and-emissions-compared-to-kirkwall-2010-.pdf
Flensburg/Germany, conducted a study in the Islands of Rousay, Eday and the town of Kirkwall, capital of the Orkney Islands within the International Class 2010. The field research study aims to determine the [...] and CO2 emissions from transport for the isles? 1.3 Objective and Relevance of the study The main objective of this study is to determine the difference of the direct and embedded transport energy consumption [...] this report the methodology of the study is presented and more detailed explanations about the type and approach used, the sampling and the limitations of the study are given. Chapter 3 analyses the data
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/an-evaluation-of-the-clean-sleat-project-2011-.pdf
a follow-up study. In 2008 an initial study on the ecological footprint of the Sleat Peninsula was completed by a group of fellow students from the University of Flensburg. The 2008 study revealed that [...] was then compared with carbon footprint from the 2008 study. In this way the assumption of the study was tested. In the qualitative aspects of the study we assessed: The community’s attitudinal change. This [...] in this study in terms of organization, making contacts and providing the necessary information to prepare this report. Our special thanks go to the Sleat Community Trust (SCT) for whom this study was done
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/assessment-of-renewable-energy-technologies-for-the-sustainable-development-of-the-isle-of-jura-2012-.pdf
gratitude to all individuals and organizations that have assisted us throughout this assessment study. This study could not have been successfully done without the support from the Jura Development Trust (JDT) [...] this site. The study focuses on these two locations. In the report, the locations are referred to as the proposed site and the alternative site. 3.2 Scope The scope of this part of the study included an [...] qualitative household survey was conducted at the start of the study to determine the community‘s acceptance of the proposed wind project. The study considered the following four scenarios based on the Scottish
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/assessment-and-future-scenarios-of-knoydarts-electricity-system-2013-.pdf
community. The project focuses on four study areas with the following sub-objectives: 1. A long term Electricity Plan for Knoydart is developed 2. A feasibility Study for new micro-hydropower plants to reduce [...] 274,3 m – from turbine plate • 340 m – from pressure test John Duncanson Study. To verify the value that was used in this study, 2 m contour maps were purchased for use in the software QuantumGIS. The [...] considered in this study, it is recommended to carry out at least one year of flow measurements and correlate them to the long-term data before taking an investment decision. The study includes: • identification
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/ic-2016-the-assessment-of-renewable-energy-projects-for-community-benefit-in-west-harris.pdf
In this study, long term flow data was not avail- able for any of the identified sites. The Gleann Dubhlinn site had a limited number of stage and flow measurements available from previous studies. The only [...] energy in the regional and national context. Simultaneously, different reports and studies related to the sites of study were considered to have a broad overview of the chal- lenges, constraints and opp [...] East Hydrogen Economic Study. [Online] Available at: http://www.element-energy.co.uk/wordpress/wp- content/uploads/2014/12/16102014-Tees-Valley-and-North-East-Hydrogen-Economic-Study- Executive-....pdf [Accessed
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/2017-final-report-international-class.pdf
cooperate in the study project in different ways. Some interviewees are found as supportive to renewable energy project especially the approach of this study project. However, a positive study result might [...] and recommendations are given in chapter 9. 2 Methodology 2.1 Objective of the Study The overall objective of this study is to assess a community owned project to meet local heat demand from locally available [...] has been used for this study from 25th February – 1st March 2017. The questionnaire was prepared by the students to gather following information which are required for this study: • Present condition of
fileadmin/content/institute/iim/dokumente/forschung/discussion-papers/24-hh-ungenauigkeit-bei-der-unternehmensbewertung....pdf
wir uns im Rahmen dieser Untersuchung nicht. 11 Vgl. Svensson, Institut for International Economic Studies, University of Stockholm, 1994 S. 6; Deutsche Bun- desbank, Monatsbericht Oktober 1997, S. 64. 4 [...] Interpreting Forward Interest Rates, Seminar Paper No. 579, Institut for International Economic Studies, University of Stockholm, 1994. Wagner/Saur/Willershausen, Zur Anwendung der Neuerungen der Unte
fileadmin/content/studiengaenge/eucs/dokumente/downloads/introstudiport-eucs-2017.pdf
When and Where? Which? How? Registration process Now click your way through the structure of your study program… Registration for exams Stand: 06.10.2016 Torsten Becker lsf-admin@uni-flensburg.de When and
fileadmin/content/studiengaenge/eucs/dokumente/downloads/our-new-semester-is-here.2.pdf
the Student Guidance and Counselling Service, the ‘Erstis’ have the opportunity to explore their study courses and programmes with the respective ‘Fachschaft’. Questions can be asked, problems can be solved [...] throughout the first year. As Tuesday followed, so did the official introduction led by the head of studies, Prof. Dr. Anne Reichold. For the first time, those students who had already arrived, sat in one