Search narrowed by:
Remove all filters
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/alumni-workshop-report-part1.pdf
projects and programmes to optimise the integration of Climate Change aspects into its projects while applying the GTZ Climate Check. This ongoing process aims to ensure that all development cooperation efforts [...] association in the next 3 months – 31 Dec 09 5. Decide country location and topic of the next workshop, apply by July 2010 To be done after the workshop: 1. FAEM Nepal to circulate its Bylaws - Sharada 2. Each [...] to be communicated to all the alumni. 5. Decide country location and topic of the next workshop, apply by July 2010 - Favoured next location : China, India, Dubai or Germany - Can be global – tickets to
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/alumni-workshop-report-part3.pdf
replicability of this kind of process can lead to a high degree of motivation in different countries in applying the policies of climate change and mitigating the adverse effects of bad urban planning. 177 Demand [...] recovery from MSW. There is scope for further research and updating the study. This model can also be applied for Landfill, Gasification or Pyrolysis Technology by adding or subtracting flow loops. According [...] achieving the expectations effectively. The research uses participation and systemic approaches and applies methods/techniques of literatures study, Rapid Rural Appraisal (RRA), field experiment, Life Cycle
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/sesam-african-workshop-2008-final.pdf
inferior standard. Remarkably, the strategy applied for the dissemination of the stove is as essential as the choice of the stove. In many instances, the strategy applied for dissemination is discordant with [...] of financial support to develop renewable energy technologies etc. While each developing country applies different approaches to respond to aforementioned challenges, sharing experiences among SESAM/ARTES [...] countries. This will contribute to discuss and identify proper energy polices and strategies to be applied and various innovative approaches in providing incentives to support renewable energy development
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/alumni/yb-2014-eem-ppre.pdf
western Kenya.” Daily Nation, 11 August 2011. FUAS. “Federation of Universities of Applied Sciences, Laurea University of Applied Sciences:.” n.d. http://www.laurea.fi/en/connect/results/Documents/Kenya%20F [...] atlases of demand and supply for Denmark and Europe. Main teaching activities include courses in applied geographical information science and energy planning. He is in charge of the expanding PhD programme [...] mini-grids; or the extension of the national, central grid. When having to decide about the technology to apply, effectiveness and economic cost are thought to be drivers for decision-making. The present paper
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/alumni/full-report.pdf
Chemistry General Chemistry III Applied Chemistry II/19 Management of toxic chemicals Chemistry Applied Chemistry II/20 Management of hazardous wastes Chemistry Applied Chemistry II/21 Management of solid [...] effect o Natural resources, energy and environment o Soil fertility and productivity o Agrochemicals Applied Chemistry o Water pollution and its prevention o Energy sources and consumption in industries o Factors [...] Geography Introduction to Climate Biology Ecology and Conservation Chemistry General Chemistry III Applied Chemistry Physics Earth Science and Astronomy II/10 Planning and management of land resources Geography
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/alumni/the-assessment-of-renewable-energy-projects-for-community-benefit-in-west-harris.pdf
per kWh) and is applied to the base energy generation, a positive NPV and an IRR almost doubled the discount rate results. This is an indication of the minimum FIT that should be applied for the project [...] of two 500 kW Windflow® turbines proves feasible only when a particular minimum FIT is applied. With no FIT applied, this project proves to be unprofitable at the three chosen energy outputs. With the base [...] organized as follows: Chapter 2 includes a general back- ground. Chapter 3 explains the methodology applied in this research. Chapter 4 establish the assumptions made in the economic analysis of the projects
fileadmin/content/studiengaenge/eucs/dokumente/downloads/ba-eucs-presentation.pdf
professors and experienced professionals • Possibility to learn a wide range of subjects and to apply them on career oriented projects • Proximity to the students • No tuition fees www.uni-flensburg.de/eucs
fileadmin/content/studiengaenge/eucs/dokumente/downloads/online-application.pdf
website. On this page you will also see which semester you are applying to. In this case it was Winter Semester 2016. Make sure you are applying to start your studies in the correct semester. Once you have [...] have read all the information and checked the semester you are applying to, click “Continue” at the lower right corner of the page. 3. Personal information Please fill in your own personal information in [...] Subject for main application Here, the subject of study is European Cultures and Society. If you are applying to the first semester of B.A. European Cultures and Society, then you should write 1. If you are
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/1.-eem-international-class-2015-achiltibuie-final.pdf
policies and plans which further promote their usage. These initiatives have already been successfully applied in combining the abundantly available renewable energy resources of the regions with the desire of [...] local project developers, as well as the community residents. The overall goal of the study was to apply the appropriate level of technical, economic and social analyses to adequately represent the complex [...] In order to receive the best FIT rates it is expedient that the remaining wind and hydro projects apply for accreditation soon after the completion of the grid study by the SSE. In this way the projects
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/ic-2014-applecross-report.pdf
detached house *** The floor improvement is only applied in the living room, due to the most occupied place in the house **** The floor improvement is only applied in the kitchen, due to the most occupied place [...] d of different walls). These types of walls are considered to be difficult to insulate; however applying some insulation to the solid walls in HtT houses can reduce heat losses by 35% (Newman, 2014). B [...] R E-1990 It was assumed that dwellings that were built after this date had already followed and applied the local or national building regulations; therefore those dwellings also have sufficient energy